2025-06-30
Leshan Frac Proppants Pilot Production Line
Zhengzhou Mining Machinery, as requested by the design institute and the project owner, designed and manufactured a pilot line for fracturing proppants with a production capacity of 100kg/h. The system includes batching, mixing, granulation, calcination, and cooling processes, with calcination temperatures reaching up to 1500°C.…
2025-03-05
Jiangsu 200,000 m?/a Contaminated Soil Sludge Ceramsite Project
This project mainly uses contaminated soil and sludge as raw materials to set up the 200,000m3/a Contaminated Soil Sludge Ceramide Project in Jiangsu Province. The main equipment in this project include Double-Shaft Mixer, Rotary Dryer, Rotary Kiln, Rotary Dryer and the related conveying equipment and etc.…
2023-08-16
Coal Gangue Ceramsite Test Project of ENFI Project
绿帽社., Ltd has been committed to the process research and development of coal gangue ceramsite production line for many years. It has a mature design scheme of coal gangue ceramsite and the production capacity of supporting equipment, which can greatly reduce the user's research and development costs, improve the success rate of industrial production lines, and provide customers with trusted support.…
2022-08-18
Qingdao Shouyi 200,000 m?/a Ceramsite Production Line Project
This project is a project of Qingdao Shouyi Environmental Technology Co., Ltd. with an annual output of 200,000 cubic meters of finished ceramsite. The main equipment is the design, manufacture, installation and commissioning of ceramsite rotary kiln and cooler equipment. The main raw materials of the project are mainly waste soil, sludge and industrial waste residue, which are aged, and then granulated and calcined to form ceramsite.…
2021-08-20
Southest Asia 60 tph Cement Grinding Project
The construction of the Project aims to grind the raw materials into cement products according to their ratio requirements, and package them. The requirements of high environmental protection and high automation in the construction of this project ensure the smooth implementation of the project.…
2020-05-30
Jiangsu Ruixin Shiyue Sludge Ceramsite Production Line Project
This project is mainly for the design, manufacture, installation and commissioning of the main equipment of the ceramsite rotary kiln, cooler, raw material dryer and other equipment of the 600,000 cubic meters of sludge ceramsite production line per year. The project is mainly to treat municipal sludge and general industrial sludge.…
2020-03-09
? 2.5m Disc Granulator for Xinxiang Huaxing Chemical Co., Ltd., China
The customer uses ? 2.5m dis granulator for granulation, with an output of 2-3 tons per hour, the ratio of dry powder to acid solution is 1:1.3, and the pellet size is 3-5mm.…